mirror of
https://github.com/TeachBooks/template.git
synced 2026-11-12 22:25:52 +00:00
Update general_design_guide.ipynb
This commit is contained in:
parent
3634adaae5
commit
936016c3c8
1 changed files with 144 additions and 10 deletions
|
|
@ -4,17 +4,154 @@
|
|||
"cell_type": "markdown",
|
||||
"metadata": {},
|
||||
"source": [
|
||||
"# General design guide\n",
|
||||
"\n",
|
||||
"\n"
|
||||
"# General design guide",
|
||||
]
|
||||
},
|
||||
{
|
||||
"cell_type": "markdown",
|
||||
"metadata": {},
|
||||
"source": []
|
||||
}
|
||||
],
|
||||
"source": [
|
||||
"## The design process\n",
|
||||
"\n",
|
||||
"The design process is part of the life cycle of a structure: the ‘idea-phase’,
|
||||
the ‘design-phase’, the ‘construction phase’, the ‘use and maintenance phase’,
|
||||
and the ‘demolition phase’. The structural engineer acts in the ‘design phase’.
|
||||
The terms ‘initiative’, ‘project definition’, ‘concepts’, ‘preliminary design’,
|
||||
and ‘verification of structural safety’ will be explained shortly below.\\\n"
|
||||
]
|
||||
},
|
||||
{
|
||||
"cell_type": "markdown",
|
||||
"metadata": {},
|
||||
"source": [
|
||||
"## Project definition\n",
|
||||
"\n",
|
||||
"To define the project, one first drafts
|
||||
a plan of action (strategy). This
|
||||
determines how to proceed in this
|
||||
phase, what the results should be and
|
||||
the criteria to which the result of this
|
||||
phase should be compared. Just like
|
||||
in the previous phase various aspectstudies
|
||||
need to be done. Eventually
|
||||
this leads to the formulation of a report
|
||||
containing all basic assumptions
|
||||
concerning the structural design. This
|
||||
forms a supplement to the PoR.\\\n"
|
||||
]
|
||||
},
|
||||
{
|
||||
"cell_type": "markdown",
|
||||
"metadata": {},
|
||||
"source": [
|
||||
"## Concepts\n",
|
||||
"\n",
|
||||
"In this phase too several studies
|
||||
have to be performed. The designer
|
||||
makes several ‘structural’ concepts.
|
||||
To make a sensible design, he
|
||||
first analyses the force flow in both
|
||||
horizontal and vertical direction. Also
|
||||
the ability of the structure to retain
|
||||
its shape and place is investigated
|
||||
as well as the connections between
|
||||
different elements and parts of the
|
||||
building. After feedback from the
|
||||
structural assumptions at least two of
|
||||
the concepts are chosen for further
|
||||
analysis. With the aid of design tools
|
||||
(rules of thumb, diagrams and tables)
|
||||
the overall dimensions of the structure
|
||||
(including stability measures) are
|
||||
determined and critical connections
|
||||
are studied for feasibility. The
|
||||
sections on different materials contain
|
||||
information on structural elements
|
||||
(such as precast conrete beams,
|
||||
hollow core slabs etc.) and tables
|
||||
with available (steel) profiles to come
|
||||
to reasonable dimensions. Already
|
||||
in this stage it is wise to orientate on
|
||||
different foundation possibilities as the
|
||||
foundation can have influence on the
|
||||
rest of the structure. The section on
|
||||
foundations can provide the necessary
|
||||
information. Although the load bearing
|
||||
structure is designed, this phase is not
|
||||
yet finished. Finally the designer needs
|
||||
to look into possible façades and roof
|
||||
elements. Now a choice can be made
|
||||
between the different concepts based
|
||||
on a multi criteria analysis. The criteria
|
||||
are based on the PoR and structural
|
||||
assumptions.\\\n"
|
||||
]
|
||||
},
|
||||
{
|
||||
"cell_type": "markdown",
|
||||
"metadata": {},
|
||||
"source": [
|
||||
"## Preliminairy structural design\n",
|
||||
"\n",
|
||||
"Now all the dimensions of the chosen
|
||||
structure can be determined. Again
|
||||
the sections on the different materials
|
||||
can be helpful. Make sure, also in
|
||||
this preliminairy design, that stability
|
||||
of your structure is ensured. It is a
|
||||
good idea to search for alternative
|
||||
possibilities for the foundation and
|
||||
connecting structure to prevent
|
||||
surprises in the final design stage. Also
|
||||
the building envelope deserves some
|
||||
attention. Use the different examples
|
||||
given in the later chapters.\\\n"
|
||||
]
|
||||
},
|
||||
{
|
||||
"cell_type": "markdown",
|
||||
"metadata": {},
|
||||
"source": [
|
||||
"## Preliminary design\n",
|
||||
"\n",
|
||||
"In this phase a further analysis
|
||||
of the strength, behaviour of the
|
||||
structure is made. Also the stability
|
||||
is checked, and necessary stability
|
||||
measures are added. To do this, quick
|
||||
calculations are made with simplified
|
||||
load combinations. The section on
|
||||
mechanics offers the necessary
|
||||
formulas and ‘forget-me-nots’. More
|
||||
attention is given to the foundation
|
||||
of the structure. Calculate the total
|
||||
vertical load and design a transition
|
||||
structure (which transfers the loads
|
||||
from the main load bearing structure to
|
||||
the foundation). Also a further analysis
|
||||
is made of the possible façades, roof
|
||||
elements and other building finishes
|
||||
needs to be made. How are the
|
||||
building finishes connected to the load
|
||||
bearing structure?\\\n"
|
||||
]
|
||||
},
|
||||
{
|
||||
"cell_type": "markdown",
|
||||
"metadata": {},
|
||||
"source": [
|
||||
"## Verification of the structural safety and servicability\n",
|
||||
"\n",
|
||||
"The final preliminairy design of
|
||||
which the final dimensions are now
|
||||
determined, has to be checked with a
|
||||
structural code. In Europe this is the
|
||||
Eurocode. The different sections on
|
||||
steel, timber, concrete and foundations
|
||||
contain the necessary information to
|
||||
perform the check.\\\n"
|
||||
]
|
||||
},
|
||||
"metadata": {
|
||||
"kernelspec": {
|
||||
"display_name": "Python 3",
|
||||
|
|
@ -40,7 +177,4 @@
|
|||
"version_minor": 0
|
||||
}
|
||||
}
|
||||
},
|
||||
"nbformat": 4,
|
||||
"nbformat_minor": 4
|
||||
}
|
||||
}
|
||||
|
|
|
|||
Loading…
Add table
Add a link
Reference in a new issue