mirror of
https://github.com/TeachBooks/template.git
synced 2026-11-13 14:45:52 +00:00
fixing broken cell structure general design guide
This commit is contained in:
parent
936016c3c8
commit
2b1c2e6387
1 changed files with 64 additions and 134 deletions
|
|
@ -4,154 +4,81 @@
|
||||||
"cell_type": "markdown",
|
"cell_type": "markdown",
|
||||||
"metadata": {},
|
"metadata": {},
|
||||||
"source": [
|
"source": [
|
||||||
"# General design guide",
|
"# General design guide\n",
|
||||||
]
|
"\n",
|
||||||
},
|
|
||||||
{
|
|
||||||
"cell_type": "markdown",
|
|
||||||
"metadata": {},
|
|
||||||
"source": [
|
|
||||||
"## The design process\n",
|
"## The design process\n",
|
||||||
"\n",
|
"\n",
|
||||||
"The design process is part of the life cycle of a structure: the ‘idea-phase’,
|
"The design process is part of the life cycle of a structure: the ‘idea-phase’, \n",
|
||||||
the ‘design-phase’, the ‘construction phase’, the ‘use and maintenance phase’,
|
"the ‘design-phase’, the ‘construction phase’, the ‘use and maintenance phase’, \n",
|
||||||
and the ‘demolition phase’. The structural engineer acts in the ‘design phase’.
|
"and the ‘demolition phase’. The structural engineer acts in the ‘design phase’. \n",
|
||||||
The terms ‘initiative’, ‘project definition’, ‘concepts’, ‘preliminary design’,
|
"The terms ‘initiative’, ‘project definition’, ‘concepts’, ‘preliminary design’, \n",
|
||||||
and ‘verification of structural safety’ will be explained shortly below.\\\n"
|
"and ‘verification of structural safety’ will be explained shortly below.\n",
|
||||||
]
|
"\n",
|
||||||
},
|
|
||||||
{
|
|
||||||
"cell_type": "markdown",
|
|
||||||
"metadata": {},
|
|
||||||
"source": [
|
|
||||||
"## Project definition\n",
|
"## Project definition\n",
|
||||||
"\n",
|
"\n",
|
||||||
"To define the project, one first drafts
|
"To define the project, one first drafts a plan of action (strategy). This\n",
|
||||||
a plan of action (strategy). This
|
"determines how to proceed in this phase, what the results should be and\n",
|
||||||
determines how to proceed in this
|
"the criteria to which the result of this phase should be compared. Just like\n",
|
||||||
phase, what the results should be and
|
"in the previous phase various aspectstudies need to be done. Eventually\n",
|
||||||
the criteria to which the result of this
|
"this leads to the formulation of a report containing all basic assumptions\n",
|
||||||
phase should be compared. Just like
|
"concerning the structural design. This forms a supplement to the PoR.\n",
|
||||||
in the previous phase various aspectstudies
|
"\n",
|
||||||
need to be done. Eventually
|
|
||||||
this leads to the formulation of a report
|
|
||||||
containing all basic assumptions
|
|
||||||
concerning the structural design. This
|
|
||||||
forms a supplement to the PoR.\\\n"
|
|
||||||
]
|
|
||||||
},
|
|
||||||
{
|
|
||||||
"cell_type": "markdown",
|
|
||||||
"metadata": {},
|
|
||||||
"source": [
|
|
||||||
"## Concepts\n",
|
"## Concepts\n",
|
||||||
"\n",
|
"\n",
|
||||||
"In this phase too several studies
|
"In this phase too several studies have to be performed. The designer makes several\n",
|
||||||
have to be performed. The designer
|
"‘structural’ concepts. To make a sensible design, he first analyses the force flow\n",
|
||||||
makes several ‘structural’ concepts.
|
"in both horizontal and vertical direction. Also the ability of the structure to retain\n",
|
||||||
To make a sensible design, he
|
"its shape and place is investigated as well as the connections between different\n",
|
||||||
first analyses the force flow in both
|
"elements and parts of the building. After feedback from the structural assumptions\n",
|
||||||
horizontal and vertical direction. Also
|
"at least two of the concepts are chosen for further analysis. With the aid of design\n",
|
||||||
the ability of the structure to retain
|
"tools (rules of thumb, diagrams and tables) the overall dimensions of the structure\n",
|
||||||
its shape and place is investigated
|
"(including stability measures) are determined and critical connections are studied\n",
|
||||||
as well as the connections between
|
"for feasibility. The sections on different materials contain information on\n",
|
||||||
different elements and parts of the
|
"structural elements (such as precast conrete beams, hollow core slabs etc.)\n",
|
||||||
building. After feedback from the
|
"and tables with available (steel) profiles to come to reasonable dimensions. Already\n",
|
||||||
structural assumptions at least two of
|
"in this stage it is wise to orientate on different foundation possibilities as\n",
|
||||||
the concepts are chosen for further
|
"the foundation can have influence on the rest of the structure. The section on\n",
|
||||||
analysis. With the aid of design tools
|
"foundations can provide the necessary information. Although the load bearing\n",
|
||||||
(rules of thumb, diagrams and tables)
|
"structure is designed, this phase is not yet finished. Finally the designer needs\n",
|
||||||
the overall dimensions of the structure
|
"to look into possible façades and roof elements. Now a choice can be made between\n",
|
||||||
(including stability measures) are
|
"the different concepts based on a multi criteria analysis. The criteria are based\n",
|
||||||
determined and critical connections
|
"on the PoR and structural assumptions.\n",
|
||||||
are studied for feasibility. The
|
"\n",
|
||||||
sections on different materials contain
|
|
||||||
information on structural elements
|
|
||||||
(such as precast conrete beams,
|
|
||||||
hollow core slabs etc.) and tables
|
|
||||||
with available (steel) profiles to come
|
|
||||||
to reasonable dimensions. Already
|
|
||||||
in this stage it is wise to orientate on
|
|
||||||
different foundation possibilities as the
|
|
||||||
foundation can have influence on the
|
|
||||||
rest of the structure. The section on
|
|
||||||
foundations can provide the necessary
|
|
||||||
information. Although the load bearing
|
|
||||||
structure is designed, this phase is not
|
|
||||||
yet finished. Finally the designer needs
|
|
||||||
to look into possible façades and roof
|
|
||||||
elements. Now a choice can be made
|
|
||||||
between the different concepts based
|
|
||||||
on a multi criteria analysis. The criteria
|
|
||||||
are based on the PoR and structural
|
|
||||||
assumptions.\\\n"
|
|
||||||
]
|
|
||||||
},
|
|
||||||
{
|
|
||||||
"cell_type": "markdown",
|
|
||||||
"metadata": {},
|
|
||||||
"source": [
|
|
||||||
"## Preliminairy structural design\n",
|
"## Preliminairy structural design\n",
|
||||||
"\n",
|
"\n",
|
||||||
"Now all the dimensions of the chosen
|
"Now all the dimensions of the chosen structure can be determined. Again the sections\n",
|
||||||
structure can be determined. Again
|
"on the different materials can be helpful. Make sure, also in this preliminairy\n",
|
||||||
the sections on the different materials
|
"design, that stability of your structure is ensured. It is a good idea to search\n",
|
||||||
can be helpful. Make sure, also in
|
"for alternative possibilities for the foundation and connecting structure to prevent\n",
|
||||||
this preliminairy design, that stability
|
"surprises in the final design stage. Also the building envelope deserves some\n",
|
||||||
of your structure is ensured. It is a
|
"attention. Use the different examples given in the later chapters.\n",
|
||||||
good idea to search for alternative
|
"\n",
|
||||||
possibilities for the foundation and
|
|
||||||
connecting structure to prevent
|
|
||||||
surprises in the final design stage. Also
|
|
||||||
the building envelope deserves some
|
|
||||||
attention. Use the different examples
|
|
||||||
given in the later chapters.\\\n"
|
|
||||||
]
|
|
||||||
},
|
|
||||||
{
|
|
||||||
"cell_type": "markdown",
|
|
||||||
"metadata": {},
|
|
||||||
"source": [
|
|
||||||
"## Preliminary design\n",
|
"## Preliminary design\n",
|
||||||
"\n",
|
"\n",
|
||||||
"In this phase a further analysis
|
"In this phase a further analysis of the strength, behaviour of the structure\n",
|
||||||
of the strength, behaviour of the
|
"is made. Also the stability is checked, and necessary stability measures are added.\n",
|
||||||
structure is made. Also the stability
|
"To do this, quick calculations are made with simplified load combinations. The\n",
|
||||||
is checked, and necessary stability
|
"section on mechanics offers the necessary formulas and ‘forget-me-nots’. More\n",
|
||||||
measures are added. To do this, quick
|
"attention is given to the foundation of the structure. Calculate the total vertical\n",
|
||||||
calculations are made with simplified
|
"load and design a transition structure (which transfers the loads from the main\n",
|
||||||
load combinations. The section on
|
"load bearing structure to the foundation). Also a further analysis is made of the\n",
|
||||||
mechanics offers the necessary
|
"possible façades, roof elements and other building finishes needs to be made. How\n",
|
||||||
formulas and ‘forget-me-nots’. More
|
"are the building finishes connected to the load bearing structure?\n",
|
||||||
attention is given to the foundation
|
"\n",
|
||||||
of the structure. Calculate the total
|
"## Verification of the structural safety and servicability\n",
|
||||||
vertical load and design a transition
|
"\n",
|
||||||
structure (which transfers the loads
|
"The final preliminairy design of which the final dimensions are now determined,\n",
|
||||||
from the main load bearing structure to
|
"has to be checked with a structural code. In Europe this is the Eurocode. The\n",
|
||||||
the foundation). Also a further analysis
|
"different sections on steel, timber, concrete and foundations contain the\n",
|
||||||
is made of the possible façades, roof
|
"necessary information to perform the check.\n"
|
||||||
elements and other building finishes
|
|
||||||
needs to be made. How are the
|
|
||||||
building finishes connected to the load
|
|
||||||
bearing structure?\\\n"
|
|
||||||
]
|
]
|
||||||
},
|
},
|
||||||
{
|
{
|
||||||
"cell_type": "markdown",
|
"cell_type": "markdown",
|
||||||
"metadata": {},
|
"metadata": {},
|
||||||
"source": [
|
"source": []
|
||||||
"## Verification of the structural safety and servicability\n",
|
}
|
||||||
"\n",
|
],
|
||||||
"The final preliminairy design of
|
|
||||||
which the final dimensions are now
|
|
||||||
determined, has to be checked with a
|
|
||||||
structural code. In Europe this is the
|
|
||||||
Eurocode. The different sections on
|
|
||||||
steel, timber, concrete and foundations
|
|
||||||
contain the necessary information to
|
|
||||||
perform the check.\\\n"
|
|
||||||
]
|
|
||||||
},
|
|
||||||
"metadata": {
|
"metadata": {
|
||||||
"kernelspec": {
|
"kernelspec": {
|
||||||
"display_name": "Python 3",
|
"display_name": "Python 3",
|
||||||
|
|
@ -177,4 +104,7 @@
|
||||||
"version_minor": 0
|
"version_minor": 0
|
||||||
}
|
}
|
||||||
}
|
}
|
||||||
}
|
},
|
||||||
|
"nbformat": 4,
|
||||||
|
"nbformat_minor": 4
|
||||||
|
}
|
||||||
|
|
|
||||||
Loading…
Add table
Add a link
Reference in a new issue