mirror of
https://github.com/TeachBooks/template.git
synced 2026-11-12 22:25:52 +00:00
Merge pull request #5 from TeachBooks/main
pulling main towards basic properties
This commit is contained in:
commit
cdf9bd0832
1 changed files with 65 additions and 1 deletions
|
|
@ -6,7 +6,71 @@
|
|||
"source": [
|
||||
"# General design guide\n",
|
||||
"\n",
|
||||
"\n"
|
||||
"## The design process\n",
|
||||
"\n",
|
||||
"The design process is part of the life cycle of a structure: the ‘idea-phase’, \n",
|
||||
"the ‘design-phase’, the ‘construction phase’, the ‘use and maintenance phase’, \n",
|
||||
"and the ‘demolition phase’. The structural engineer acts in the ‘design phase’. \n",
|
||||
"The terms ‘initiative’, ‘project definition’, ‘concepts’, ‘preliminary design’, \n",
|
||||
"and ‘verification of structural safety’ will be explained shortly below.\n",
|
||||
"\n",
|
||||
"## Project definition\n",
|
||||
"\n",
|
||||
"To define the project, one first drafts a plan of action (strategy). This\n",
|
||||
"determines how to proceed in this phase, what the results should be and\n",
|
||||
"the criteria to which the result of this phase should be compared. Just like\n",
|
||||
"in the previous phase various aspectstudies need to be done. Eventually\n",
|
||||
"this leads to the formulation of a report containing all basic assumptions\n",
|
||||
"concerning the structural design. This forms a supplement to the PoR.\n",
|
||||
"\n",
|
||||
"## Concepts\n",
|
||||
"\n",
|
||||
"In this phase too several studies have to be performed. The designer makes several\n",
|
||||
"‘structural’ concepts. To make a sensible design, he first analyses the force flow\n",
|
||||
"in both horizontal and vertical direction. Also the ability of the structure to retain\n",
|
||||
"its shape and place is investigated as well as the connections between different\n",
|
||||
"elements and parts of the building. After feedback from the structural assumptions\n",
|
||||
"at least two of the concepts are chosen for further analysis. With the aid of design\n",
|
||||
"tools (rules of thumb, diagrams and tables) the overall dimensions of the structure\n",
|
||||
"(including stability measures) are determined and critical connections are studied\n",
|
||||
"for feasibility. The sections on different materials contain information on\n",
|
||||
"structural elements (such as precast conrete beams, hollow core slabs etc.)\n",
|
||||
"and tables with available (steel) profiles to come to reasonable dimensions. Already\n",
|
||||
"in this stage it is wise to orientate on different foundation possibilities as\n",
|
||||
"the foundation can have influence on the rest of the structure. The section on\n",
|
||||
"foundations can provide the necessary information. Although the load bearing\n",
|
||||
"structure is designed, this phase is not yet finished. Finally the designer needs\n",
|
||||
"to look into possible façades and roof elements. Now a choice can be made between\n",
|
||||
"the different concepts based on a multi criteria analysis. The criteria are based\n",
|
||||
"on the PoR and structural assumptions.\n",
|
||||
"\n",
|
||||
"## Preliminairy structural design\n",
|
||||
"\n",
|
||||
"Now all the dimensions of the chosen structure can be determined. Again the sections\n",
|
||||
"on the different materials can be helpful. Make sure, also in this preliminairy\n",
|
||||
"design, that stability of your structure is ensured. It is a good idea to search\n",
|
||||
"for alternative possibilities for the foundation and connecting structure to prevent\n",
|
||||
"surprises in the final design stage. Also the building envelope deserves some\n",
|
||||
"attention. Use the different examples given in the later chapters.\n",
|
||||
"\n",
|
||||
"## Preliminary design\n",
|
||||
"\n",
|
||||
"In this phase a further analysis of the strength, behaviour of the structure\n",
|
||||
"is made. Also the stability is checked, and necessary stability measures are added.\n",
|
||||
"To do this, quick calculations are made with simplified load combinations. The\n",
|
||||
"section on mechanics offers the necessary formulas and ‘forget-me-nots’. More\n",
|
||||
"attention is given to the foundation of the structure. Calculate the total vertical\n",
|
||||
"load and design a transition structure (which transfers the loads from the main\n",
|
||||
"load bearing structure to the foundation). Also a further analysis is made of the\n",
|
||||
"possible façades, roof elements and other building finishes needs to be made. How\n",
|
||||
"are the building finishes connected to the load bearing structure?\n",
|
||||
"\n",
|
||||
"## Verification of the structural safety and servicability\n",
|
||||
"\n",
|
||||
"The final preliminairy design of which the final dimensions are now determined,\n",
|
||||
"has to be checked with a structural code. In Europe this is the Eurocode. The\n",
|
||||
"different sections on steel, timber, concrete and foundations contain the\n",
|
||||
"necessary information to perform the check.\n"
|
||||
]
|
||||
},
|
||||
{
|
||||
|
|
|
|||
Loading…
Add table
Add a link
Reference in a new issue